Join Us

Logistics Project Application (LPA)

ADPC will treat all information as confidential.
All fields marked with ( mandatory ) are mandatory.

  • Guidelines for completing the Logistics Project (L/P) Application Form

     

    General

    Please read the below instructions before completing this Form. A separate application form is required for each project.

    • This application form can be used for Logistics & Warehousing Projects only. For Industrial Projects, please use the Industrial Project (I/P) Application Form. Kindly contact our staff members for other queries.
    • Please select the type of project: Free Zone or Non Free Zone. Free zone projects are generally for applicants who wish to have more than 49% ownership by non-UAE and non-GCC nationals.
    • Please indicate whether you are interested in building your own warehouse or whether you wish to lease Kizad’s pre-built warehouses (available at various sizes starting from approx. 1,000 m2 per unit for non-free zone and 2,000 m2 for free zone).
    • When an entry is marked as “Optional”, you may provide the information if available.
    • Please feel free to attach additional information, studies or reports to your application form.
    • The completed Application Form must be submitted along with the required documents and processing fee.
    • For more information, please contact us at kizad@adpc.ae, our website www.kizad.com or call us on Toll Free: +971 800102030

    Section1 | Applicant Details

    Please provide your contact details and relationship with the applicant company. These will be used for all future communications.

    Section2 | Proposed Project Details

    -    Briefly describe the proposed activities for the project under consideration

    -    List the main goods and products to be stored and distributed

    -    Volumes and capacity figures shall be based on expected capacity at peak operations.

    -    Workforce: Indicate the number of people you will be employing at full capacity as well as the number of shifts.

    Section3 | Land Requirement & Facility Details

    The following provide essential guidelines and ratios to consider when estimating the total land requirements for your project (these are guidelines only and full compliance is required with Kizad Rules & Regulations and applicable laws).

    Regulation Maximum Permitted Calculation Method
    Maximum Floor Area Ratio (FAR) 0.66 building Built-up Area / Plot Area
    Maximum Height 40 m max building height Measurement
    Minimum Building Setbacks 6 m Measurement
    Maximum Coverage (60%) 60% Surface exploitation / Plot Area
    Note: No open yard storage is permitted.

    Section 4 | Operations and Logistics

    Please provide details about the proposed project's cargo, materials and import exports.

    Section 5 | Utilities

    The below table illustrates the utility standards and conversion factors to assist you in estimating your project’s utilities requirements.

    Utility Definition Standard Units & Conversion Factor
    Electricity Connected load supplied in various voltage levels
    (LV, MV, HV) based on occupier demands
    Standard units in Mega Watt(MW)
    1 MW =1,000 kW 1 MW = 1,250kVA

    Potable
    Water

    Drinking water used for domestic purposes
    (kitchen, toilets etc.)
    Standard unit is Cubic Meters per Day (m3/day)
    1 m3/day = 220 GPD. Avg. consumption is 80 liters / person/ day

    Section 6 | Required Warehousing Services

    List any services that you may require (such as Inventory Management, Freight Forwarding, Customs Clearance, etc.)

    Logistics Project
    Application

    1. Applicant Details (Details Of The Person Submitting The Application)

    • Please provide your contact details and relationship with the applicant company. These will be used for all future communications.

    2. Proposed Project Details

    • Note: Briefly describe the nature, activities and process that will be conducted at site during operation.
      • Total Projected Workforce Number

    3. Land Requirements & Facility Details (Warehousing)

    • Logistics Project Application

    • Warehouse Type Total Area (in m2)

    4. Operations and Logistics

    • 4a) Cargo Details / Accessibility

      • Projected Annual Port Shipment Volume
        Cargo Type Imports (TEUs) Exports (TEUs)
        Please enter value for min. of one of the fields
      • Importance of Proximity to Khalifa Port
      • Importance of Connectivity to Airport
      • Importance of Connectivity to Railways
      • Importance of Connectivity to Highways
      • Roads Trip Generation( Please specify the number of expected trips per day )

      4b) Storage of Materials

        Add More
      • Please state type of material(s)
      • Please state volume
      • Please enter any relevant remarks

      4c) Hazardous Material ( if any )

        Add More
    • Please enter name of item(s)
    • Please state volume
    • Please state hazard class

5. Utilities (Power & Water Requirements)

  • Water Demand - Imperial Gallons Per Day (GPD) (Conversion factor: 1m3/day = 220 GPD)
  • Note: The design requirements by Abu Dhabi Sewerage Services company mandate pre-treatment and reuse/recycle of Industrial waste water allowing no more than 20% Process Water discharge into the ADSSC network as Industrial Waste Water. In addition to this, 90% Potable Water may be discharged into the ADSSC network as Sanitary Waste Water.

6. Required Warehousing Services

Checklist Attachments

  • Please attach the below to ensure timely processing of your application
form-mobile-msg
download our brochure

download our brochure